Bill of Material (BOM)
Bill of Material (BoM) is created only for those items that are being assembled in-house. For trading items, you do not need a BoM. Therefore, you need to specify a BoM at the time of creating a Stock Item or when altering its master.
This is relevant for manufacturing organizations and can be set up through Configurations
Gateway of Tally Ø F12 : Configure Ø Accts Ø Inventory info
| ||||||||||||||
Example :
To assemble one Computer (P4), the following peripherals are required..
The company assembled 10 Computers with P4 configuration using the peripherals listed in the table and stored the same in the finished goods godown. Wages of Rs.10,000 and Overheads (including power) of Rs. 1000 (Overheads are arrived at Rs.100 per computer) where incurred.
The wages were paid by cheque.
Note 1 : Create a Manufacturing Journal under Stock Journal by setting Use as Manufacturing Journal to YES.
| ||||||||||||||
Solutions :
Step-1 :
Create Ledgers à Wages and Overheads both under Direct Expenses
Step-2:
Create Item Group à Finished Goods under Primery | ||||||||||||||
Step 5 :
Make entry in a Manufacturing Journal
| ||||||||||||||
Featured Post
TNTET 2017 BREAKING NEWS
TNTET 2017 BREAKING NEWS | ஆசிரியர் தகுதித்தேர்வு நடத்த அனைத்து ஏற்பாடுகளும் தயார்...ஓரிரு நாட்களில் முறையான அறிவிப்பு வெளியாகிறது...| விண்ண...
Wednesday, April 3, 2013
BILL OF MATERIAL ( BOM) in Tally.ERP 9
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment